# Atlas / the dispatch gap.

Fictional practice records — no customer incident.

A shipping backlog review across two team timezones. The room separates the three-hour impact window from preparatory notes and preserves the unconfirmed scanner report.

## Reviewed milestone intervals

- Impact to detection: 12m
- Detection to mitigation: 78m
- Impact to resolution: 3h

Intervals are computed from the explicitly selected event IDs. Reported timestamps remain reported; chronological proximity does not establish causation.

## Timeline (UTC)

| Time | Phase / status | Event | Evidence |
| --- | --- | --- | --- |
| 2026-10-07T07:45:00Z | note / observed | atlas-01: Routine dispatch handoff completed | atlas-source (CSV row 2) |
| 2026-10-07T08:00:00Z | impact / observed | atlas-02: Dispatch acknowledgements stop in the exercise log | atlas-source (CSV row 3) |
| 2026-10-07T08:12:00Z | detected / observed | atlas-03: Queue-age alert detects the impact | atlas-source (CSV row 4) |
| 2026-10-07T08:20:00Z | note / reported | atlas-04: Warehouse lead reports a scanner warning | atlas-source (CSV row 5) |
| 2026-10-07T08:40:00Z | note / hypothesis | atlas-05: Scanner synchronization proposed as a possible factor | atlas-source (CSV row 6) |
| 2026-10-07T09:00:00Z | note / observed | atlas-06: Manual dispatch queue opened | atlas-source (CSV row 7) |
| 2026-10-07T09:10:00Z | note / observed | atlas-07: Review checklist assigned to the shift lead | atlas-source (CSV row 8) |
| 2026-10-07T09:30:00Z | mitigated / observed | atlas-08: Manual handoff accepted as mitigation | atlas-source (CSV row 9) |
| 2026-10-07T10:15:00Z | note / observed | atlas-09: Acknowledgements resume for queued orders | atlas-source (CSV row 10) |
| 2026-10-07T11:00:00Z | resolved / observed | atlas-10: Reviewed dispatch backlog cleared | atlas-source (CSV row 11) |

## Cause statement — hypothesis

The scanner handoff may have stopped propagating dispatch acknowledgements. The local records do not establish a device or vendor fault.

## Owned follow-ups

- **Verify the scanner handoff path** — Ari / operations; due 2026-10-16; open; event atlas-05
  Acceptance: Record a controlled check with before/after evidence. Review the working hypothesis before changing production.
- **Update the detection and handoff checklist** — Sam / shift lead; due 2026-10-19; in-progress; event atlas-03
  Acceptance: Run one fictional drill; preserve reviewed milestone IDs, source offsets and an explicit backup owner.

## Source files

- atlas-source: [Atlas dispatch / exercise record](evidence/source-01.txt); SHA-256 `a8ca4b101ab23123a6ad802656e9a5d064dc4c78e230566a44a8178bcf96bbac`
  Authored fictional exercise log. Event IDs and timestamp strings are preserved; source hash checks file integrity only.
